Work scope

Assembly of Technical Centers from scratch:

  • Pipe Welding (Stainless steel/Black steel)

  • Pipe fitting

  • Assembly and connection of additional parts

Installation and Commissioning of equipment:

  • Connection to building pipeline system
  • Insulation of piping systems

Works gallery